作 者:张健 ZHANG Jian(Huadian International Zhouxian Power Plant,Jining 273500,China)
出 处:《电工技术》2024年第S01期259-262,共4页Electric Engineering
摘 要:新能源企业的快速发展,为山东电力现货市场带来了较高的消纳成本,火电机组被迫频繁启停进行深度调峰,春秋季火电机组经常出现日内启停情况,不仅对火电机组的安全可靠性提出了极大的考验,也对机组的灵活性提出了更高的要求。通过对DEH系统的逻辑进行优化,把高压缸倒暖与调门室预暖的过程进行同步执行,增加高压缸均热控制的灵活性,达到了缩短机组启动时间,延长机组使用寿命的效果。The rapid development ofnew energy enterprises has brought higher absorption costs to Shandong power spot market.Thermal power units are forced to frequently start and stop for deep peak adjustment.During the spring and autumn seasons,thermal power units often experience daily startup and shutdown situations,which not only puts forward a great challenge for the safety and reliability of thermal power units,but also puts forward higher requirements for the flexibility of the units.In this paper,by optimizing the logic of DEH system,the process of reverse heating of the high pressure cylinder and preheating of the control vavle is carried out synchronously,increasing the flexibility of the heat soaking control of the high pressure cylinder,and achieving the effect of shortening the startup time of the unit and extending the service life of the unit.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49