检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张伯林 ZHANG Bolin(CCTEG Beijing Huayu Engineering Co.,Ltd.,Beijing 100120,China)
机构地区:[1]中煤科工集团北京华宇工程有限公司,北京100120
出 处:《煤炭工程》2024年第7期41-47,共7页Coal Engineering
摘 要:目前我国很多大中型矿井、尤其寒冷地区矿井,井筒提升系统多采用井塔提升,井塔是矿井生产重要的工业建构筑物。通过对塔然高勒矿井主井井塔体系布置、结构整体分析、基础设计、结合实际设计及建设经验,介绍主井井塔设计要点及设计注意事项,特别是为在人工快速解冻冻融土地基上建设井塔提供了设计参数和经验,为煤炭矿井主井井塔设计提供参考和帮助。Most of the large and medium-sized mines in China,especially those located in cold regions,are using shaft towers as shaft hoisting systems.The shaft tower,however,is one of the most important industrial structures in the production of coal mine.From the perspectives of the layout,the overall structural analysis and the fundamental design of the main shaft tower system in Tarangaole Mine,with further reference to the practical design and construction experience,some key points and considerations concerned with the main shaft tower design were introduced,so as to provide design parameters and experience for the construction of the shaft tower on a foundation of freezing-thawing soil by artificial rapid thawing,and give reference and assistance for the design of the main shaft tower in coal mines.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49