检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李兵 陈永春 安士凯 胡林 LI Bing;CHEN Yong-chun;AN Shi-kai;HU Lin(Pingan Coal Mining Engineering Technology Research Institute Co.,Ltd.,Huainan 232001,China;Anhui Province Coal Mine Green and Low-carbon Development Engineering Research Center,Huainan 232001,China;National Key Laboratory of Deep Coal Mining and Environmental Protection,Huainan 232001,China;Engineering Research Center for Integrated Mine Water Disaster Prevention and Control in Coal Industry,Huainan 232001,China)
机构地区:[1]平安煤炭开采工程技术研究院有限责任公司,淮南232001 [2]安徽省煤矿绿色低碳发展工程研究中心,淮南232001 [3]深部煤炭安全开采与环境保护全国重点实验室,淮南232001 [4]矿井水害综合防治煤炭行业工程研究中心,淮南232001
出 处:《科学技术与工程》2024年第22期9324-9333,共10页Science Technology and Engineering
基 金:矿井水害综合防治煤炭行业工程研究中心开放基金(2022-CIERC-07);安徽省自然资源厅公益性地质项目(2021-g-1-7)。
摘 要:煤矿开采引发地表岩土层移动变形,进而导致建筑倒塌、生态环境破坏等问题,离层注浆是减缓地表沉降的重要手段之一。为了研究淮南矿区倾斜地层采动离层的发育和稳定性,基于关键层理论,建立了由主关键层、注浆阻隔层、亚关键层组成的采动覆岩注浆离层力学结构模型,提出了注浆离层稳定性力学判据。采用离散元数值模拟分别建立水平和倾斜地层模型,模拟煤层开采过程中裂隙演化规律及可注浆离层发育情况。结果表明,水平和倾斜地层导水裂隙均未贯通注浆阻隔层,主关键层底部均发育可注浆离层,水平地层可注浆离层开度比倾斜地层的开度更大。数值模拟证明采动覆岩注浆力学结构模型可以对采动离层稳定性进行有效预测。Coal mining causes the movement and deformation of the overburden strata,which leads to the buildings collapse and the ecological environment destruction.To study the development law and stability of mining-induced separation layer in inclined strata of Huainan mining area,based on the key strata theory,an engineering geomechanical model of mining-induced overburden grouting consisting of main critical strata,grouting barrier layer and sub-critical strata was proposed,and the mechanical criterion of stability of grouting separation layer was established.Further,using discrete element numerical simulation,horizontal and inclined strata models were respectively built to simulate the evolution law of fractures and the development of grouting separation beds during coal seam mining.The results show that the grouting barrier layer is not penetrated through the water-conducting fractures in both horizontal and inclined strata.The grouting separation layer is developed at the bottom of the main key strata,and the opening of grouting separation layer in horizontal strata is larger than that in inclined strata.The numerical simulation proves that the engineering geomechanical model of mining-induced overburden grouting can effectively predict the reliability of developed separated strata.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.212.53