检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王云龙 WANG Yunlong(Shanxi Gaohe Energy Co.,Ltd.,Changzhi,Shanxi 047100,China)
出 处:《自动化应用》2024年第14期120-122,153,共4页Automation Application
摘 要:针对W3303综采工作面Xw41陷落柱和Xw44陷落柱面临的技术难题,在对工作面陷落柱采取不同方式探查的基础上,进一步探究对陷落柱的注浆处理措施。结果表明,Xw41陷落柱和Xw44陷落柱为弱富水、不导水陷落柱;Xw41陷落柱和Xw44陷落柱底板隔水层为相对安全区;注浆结束标准为注浆压力达10 MPa,持续30 min以上,实现了陷落柱的有效改造加固。In response to the technical difficulties faced by the Xw41 and Xw44 collapse columns in the W3303 fully mechanized mining face,based on different methods of exploration of the collapse columns in the working face,further exploration is conducted on the grouting treatment measures for the collapse columns.The results indicate that the Xw41 and Xw44 collapse columns are weakly water rich and non conducting collapse columns.The bottom waterproof layer of Xw41 collapse column and Xw44 collapse column is a relatively safe zone.The standard grouting pressure for grouting completion is 10 MPa,which lasts for more than 30 min,achieving effective transformation and reinforcement of the collapsed column.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.21.242