检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱加样 QIU Jiaxiang(Ninghua County construction engineering quality and safety service center,Sanming 365000)
机构地区:[1]宁化县建设工程质量安全服务中心,福建三明365000
出 处:《福建建筑》2024年第7期56-59,共4页Fujian Architecture & Construction
摘 要:工作井开挖深度大,直径宽,伴随着土体支护问题。以实际过程为例,分析深度8 m,直径7.5 m的工作井在开挖过程的稳定性。通过数值仿真软件FLAC3D模拟开挖过程,分析研究工作井坑顶水平位移、混凝土护壁沿工作井埋深的水平位移以及护壁周围的土抗力,并根据分析结果,给出工程上的建议,为类似工程提供参考。Working well excavation depth is large,diameter is wide,accompanied by soil support problems.Taking the actual process as an example,this paper analyzes the stability of a working well with a depth of 8m and a diameter of 7.5m during excavation.Numerical simulation software FLAC3D was used to simulate the excavation process,and the horizontal displacement of the working pit top,the horizontal displacement of the concrete wall along the buried depth of the working well and the soil resistance around the wall were analyzed.Based on the analysis results,engineering suggestions were given to provide reference for similar projects.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33