检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金珠鹏 田彦卫 郑德强 侯斯阳 Jin Zhupeng;Tian Yanwei;Zheng Deqiang;Hou Siyang(School of Mining Engineering,Heilongjiang University of Science&Technology,Harbin 150022,China;Laohutai Coal Mine,Fushun Mining Group Co.Ltd.,Fushun 113003,China)
机构地区:[1]黑龙江科技大学矿业工程学院,哈尔滨150022 [2]抚顺矿业集团有限责任公司老虎台矿,辽宁抚顺113003
出 处:《黑龙江科技大学学报》2024年第4期537-543,共7页Journal of Heilongjiang University of Science And Technology
基 金:黑龙江省“揭榜挂帅”科技攻关项目(2021ZXJ02A03)。
摘 要:为研究综放开采覆岩导水裂隙带发育高度,以老虎台矿区28002工作面为研究背景,分析了老虎台矿区内12组工作面导水裂隙带高度实测数据,得到了导水裂隙带高度计算的回归公式,并通过理论计算和数值模拟相结合的方法,对导水裂隙带发育高度进行预测,结合钻孔窥视,观察裂隙带上方含水层的岩性特征。结果表明:经验公式、回归公式和数值模拟结果显示28002工作面采后导水裂隙带发育高度分别为131.49、117.34和153.9 m。其发育最高点均位于计军屯组的油母页岩内,而油母页岩作为良好的隔水层为顶板防水提供了有效保障;通过钻孔窥视,计军屯组上方的页岩含水层裂隙发育程度较好,易形成导水通道,威胁工作面的安全回采。This paper is intended to investigate the developing height of the water conducting fracture zone in overlying strata of the fully mechanized mining.The study building on 28002 working face in the Laohutai mining area as the research background involves investigating the measured data of the water conducting fracture zone height in 12 groups of working faces in Laohutai mining area by using data analysis methods;obtaining the regression formula for calculating the height of the water conducting fracture zone;comprehensively predicting the development height of the water conducting fracture zone through a combination of theoretical calculation and numerical simulation methods;and observing the lithological characteristics of the aquifer above the fracture zone through drilling observation.The results show that according to the empirical formula,regression formula and numerical simulation,the developing height of water conducting fracture zone in 28002 working face after mining are 131.49,117.34 and 153.9 m,respectively.The highest developing point is located in the oil shale of Jijuntun formation,which serves as a good waterproof layer for providing effective protection for the roof waterproofing.However,through drilling observation,the shale aquifer above the Jijuntun formation has a relatively good degree of fracture development,which can easily form water conducting channels and affect the safe mining of the working face.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7