作 者:Yu Li Yixi Cuomu Yiming Gao Guoqin Lv Weiwei Lin Sirui Li Changchun Zhou
机构地区:[1]State Grid Xizang Electric Power Co.,Ltd.,Lhasa 850010,Tibet Autonomous Region,P.R.China [2]Global Energy Interconnection Development and Cooperation Organization,Beijing 100031,P.R.China [3]State Grid Fujian Power Economic Research Institute,Fuzhou 350012,P.R.China [4]Eindhoven University of Technology,Eindhoven.5621 AE,Netherlands
出 处:《Global Energy Interconnection》2024年第4期475-485,共11页全球能源互联网(英文版)
摘 要:In this study,the present situation and characteristics of power supply in remote areas are summarized.By studying the cases of power supply projects in remote areas,the experience is analyzed and described,and the applicability of related technologies,such as grid-forming storage and power load management,is studied,including grid-connection technologies,such as grid-forming converters and power load management.On this basis,three power-supply modes were proposed.The application scenarios and advantages of the three modes were compared and analyzed.Based on the local development situation,the temporal sequences of the three schemes are described,and a case study was conducted.The study of the heavy-load power supply mode in remote areas contributes to solving the problem of heavy-load green power consumption in remote areas and promoting the further development of renewable energy.
关 键 词:Remote area Renewable energy Grid-forming storage Power load management Power supply mode
分 类 号:TM72[电气工程—电力系统及自动化] X322[环境科学与工程—环境工程]