检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曲建衡 QU Jian-heng(Shandong Gangtong Engineering Management Consulting Co,Ltd,Yantai 264000,China)
机构地区:[1]山东港通工程管理咨询有限公司,烟台264000
出 处:《建材世界》2024年第4期84-87,共4页The World of Building Materials
摘 要:以烟台市某安置房项目基坑工程为例,提出竖向分层、平面分区的总体施工方案,并借助现场监测技术对基坑支护的变形进行观测。结果表明,围护桩的水平位移呈先非线性增加后减小的趋势,水平位移峰值在不同开挖阶段的开挖面附近;围护桩水平位移峰值与开挖深度的下限关系为δ=0.11%h,上限关系为δ=0.30%h,在实际工程中可通过中间拟合关系δ=0.20%h进行围护结构的变形预测。Taking the foundation pit engineering of a resettlement housing project in Yantai City as an example,this paper proposes a general construction plan of vertical stratification and plane zoning,and observes the deformation of the foundation pit support with the help of on-site monitoring technology.The results show that the horizontal displacement of the retaining pile increases nonlinearly and then decreases,and the peak horizontal displacement is near the excavation surface at different excavation stages.The relationship between the peak horizontal displacement of the retaining pile and the lower limit of the excavation depth isδ=0.11%h,and the upper limit relationship isδ=0.30%h.In practical engineering,the deformation prediction of the retaining structure can be carried out through the intermediate fitting relationshipδ=0.20%h.
关 键 词:竖向分层 软土地基 深基坑工程 变形监测 钻孔灌注桩
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.230.65