检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁硕哲 唐昊[1] 王正风 程文娟[3] 梁肖 LIANG Shuozhe;TANG Hao;WANG Zhengfeng;CHENG Wenjuan;LIANG Xiao(School of Electrical Engineering and Automation,Hefei University of Technology,Hefei 230009,Anhui Province,China;State Grid Anhui Electric Power Co.,Ltd.,Hefei 230061,Anhui Province,China;School of Computer Science and Information Engineering,Hefei University of Technology,Hefei 230601,Anhui Province,China)
机构地区:[1]合肥工业大学电气与自动化工程学院,安徽省合肥市230009 [2]国网安徽省电力有限公司,安徽省合肥市230061 [3]合肥工业大学计算机与信息学院,安徽省合肥市230601
出 处:《现代电力》2024年第4期601-611,共11页Modern Electric Power
基 金:国家电网有限公司总部科技项目“弹性环境下基于深度学习的智能调度技术研究”资助(SGTYHT/19-JS-215)。
摘 要:针对电网中可再生能源发电占比与弹性资源不断增加的趋势,提出一种计及源荷双侧弹性资源的日前调度鲁棒优化方法,以应对可再生能源发电不确定性给电网调度运行带来的挑战。首先,根据可削减负荷和可平移负荷的响应特性,分析了补偿价格对前者的最大可削减容量以及后者的可接受平移时段的影响关系,建立了负荷侧弹性资源模型;其次,考虑风电出力不确定性,并基于火电机组深度调峰及负荷侧弹性资源模型,建立了柔性负荷补偿价格−调用量联合优化的日前调度鲁棒优化模型;最后,通过算例分析验证了所提模型与方法的有效性,结果表明,考虑源荷双侧弹性资源可调度潜力的调度方法能有效提升电网运行鲁棒性与经济性。In view of the increasing trend of renewable energy generation and flexible resources in the power grid,a robust optimization method for day-ahead dispatching considering the flexible resources of both source and load sides is proposed to cope with the challenges brought by the uncertainty of renewable energy generation to the dispatching operation of the power grid.Firstly,according to the response characteristics of reducible loads and shiftable loads,the influence of compensation price on the maximum reduction capacity of the former and the acceptable translation period of the latter is analyzed,and the flexible resources model of load side is established.Secondly,considering the uncertainty of wind power output,based on the model of deep peak regulation and flexible resources on load side,a robust optimization model for day-ahead dispatching is established,in which the compensation price and adjustment quantity of flexible loads are jointly optimized.Finally,the effectiveness of the proposed model and method is verified by an example analysis.The results show that the dispatching method considering the schedulable potential of flexible resources of both source and load sides can effectively improve the robustness and economy of power grid operation.
关 键 词:可削减负荷 可平移负荷 深度调峰 弹性资源模型 鲁棒优化
分 类 号:TM734[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49