移置胶带升段移设技术的研究及应用  

Study and Application of Displacement Belt Lift Relocation Technology

在线阅读下载全文

作  者:廖忠辉 LIAO Zhonghui(Beiya Branch Company,Yunnan Geology and Mining Construction Engineering Co.,Ltd.,Dali,Yunnan 671507,China)

机构地区:[1]云南地矿建设工程有限责任公司北衙分公司,云南大理671507

出  处:《云南冶金》2024年第4期176-182,共7页Yunnan Metallurgy

摘  要:分析了移置胶带升段移设技术的影响因素,确定了最大移设距离、升段高度、移设平台坡度等参数,阐述了升段移设工程实施过程和难点,该技术应用后,排土机排土段增高了30 m,移置胶带移设频次缩减到1~2次/a,可节约成本≥6400万元。It analyzed the influencing factors for displacement belt lift relocation technology,it confirmed the maximum relocation distance,lift height,the gradient of relocation platform,and the other parameters,It described the implementation process and difficulties of lift displacement engineering,the height of dumping stage of overburden spreader was increased by 30 m,the displacement belt shift frequency was shortened by 1~2 times per year,it can save costs of more than¥64 million yuan.

关 键 词:露天矿山 胶带排岩系统 排土机 移置胶带 升段移设 

分 类 号:TQ336.2[化学工程—橡胶工业]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象