上行开采煤层减损的工作面合理布设位置研究  

Research on Reasonable Layout Position of Working Face for Reducing Coal Seam Damage in Upward Mining

在线阅读下载全文

作  者:侯树宏 马永生 朱明鎏 王思雨 柴敬[2,3] 韩志成 HOU Shuhong;MA Yongsheng;ZHU Mingliu;WANG Siyu;CHAI Jing;HAN Zhicheng(Zaoquan Colliery,CHN Energy Ningxia Coal Industry Co.,Ltd.,Yinchuan 751400,China;College of Energy Engineering,Xi′an University of Science and Technology,Xi′an 710054,China;Ministry of Education of the Western Mining and Mine Disaster Preventionand Control of Key Laboratory,Xi′an University of Science and Technology,Xi′an 710054,China)

机构地区:[1]国家能源集团宁夏煤业公司枣泉煤矿,银川751400 [2]西安科技大学能源学院,西安710054 [3]西安科技大学教育部西部矿井开采与灾害防治重点实验室,西安710054

出  处:《煤炭技术》2024年第8期104-109,共6页Coal Technology

摘  要:以枣泉煤矿五分区1煤的上行开采问题为背景,为了达到1煤的减损目的,借鉴协调减损开采的思想,采用相似模拟、数值计算的研究方法,确定了沿煤层倾向先期开采煤层工作面之间的相对布设位置和范围。采用下沉、水平移动、倾斜、曲率、水平变形5个指标,对1煤的移动变形程度和均匀性进行了评价。结果表明:当工作面在合理布设范围之内时,可以促使遗留煤柱位置处1煤进一步充分下沉,移动变形指标均达到该地质采矿条件的最均匀程度,可以有效抵消由于遗留煤柱影响而引起的待上行开采煤层的变形不均问题,使多次采动成为上行开采的有利条件,达到1煤的减损目的。Take the upward mining problem of No.1 coal seam in the fifth mining area of Zaoquan coal mine as the background.In order to achieve the goal of reducing the loss of No.1 coal seam,drawing on the idea of harmonic extraction,similar simulation and numerical calculation research methods are used to determine the relative layout position and range between the working faces of the early mining coal seam along the coal seam inclination.The degree and uniformity of movement and deformation of the No.1 coal seam were evaluated using five indicators:subsidence,horizontal movement,inclination,curvature,and horizontal deformation.The results indicate that when the working face is within the reasonable layout range proposed,it can promote the further full subsidence of the No.1 coal seam at the location of the remaining coal pillar,and the movement and deformation indicators can reach the most uniform degree of the geological mining conditions.It can effectively offset the uneven deformation problem of the coal seam to be mined upstream caused by the impact of the remaining coal pillar,making multiple mining favorable conditions for upward mining and achieving the goal of reducing the damage of the No.1 coal seam.

关 键 词:上行开采 协调开采 相似模拟 覆岩移动变形控制 VORONOI离散法 

分 类 号:TD822.2[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象