检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:岳忠翔 苏志华 杨春荣 沐助猛 王心 YUE Zhongxiang;SU Zhihua;YANG Chunrong;MU Zhumeng;WANG Xin(China Construction First Engineering Group North China Construction Co.,Ltd.,Tianjin 300450,China)
机构地区:[1]中建一局集团华北建设有限公司,天津300450
出 处:《工程质量》2024年第8期74-76,86,共4页Construction Quality
摘 要:随着我国社会经济的发展,城市中出现越来越多的超高层钢结构建筑,此类项目往往钢构件体量较大,对于钢构件的运输、储存、垂直运输要求较高,且周边施工环境较为复杂,这就给超高层钢结构项目的施工组织带来了不小的挑战。项目通过对垂直运输设备选型、平面布置以及场内交通动线组织等核心施工组织要素进行分析,得出了科学、合理的项目施工组织措施。With the development of China's social economy,there are more and more super high-rise steel structure buildings in cities.Such projects often have large volumes of steel components,requiring high requirements for the transportation,storage,and vertical transportation of steel components,and the surrounding construction environment is relatively complex,which poses significant challenges to the construction organization of super high-rise steel structure projects.The project obtains a scientific and reasonable project construction organization through analyzing core construction organization elements such as vertical transportation equipment selection,plane layout,and on-site traffic movement line organization.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7