检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张雅春 周相荣 ZHANG Ya-chun;ZHOU Xiang-rong(CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China)
机构地区:[1]中交第一航务工程局有限公司,天津300461
出 处:《中国港湾建设》2024年第8期74-77,共4页China Harbour Engineering
摘 要:针对深中通道沉管安装过程中水上一体船与水下沉管电力和通讯联系的需要,提出了一种深水沉管水下脐带缆穿舱与搭接技术。通过对其水下密封性能、承重性能等关键指标的模拟和测试,结果表明该系统可满足300 m水深抗压密封要求和14 kN的抗拉力。此技术为深中通道沉管安装提供了有效的技术支撑,其可靠性在深中通道沉管安装中得到了验证,同时可为未来更大水深沉管安装时的“船舶-沉管”通讯联系提供技术参考。To meet the need of electric power and communication connection between waterborne integrated vessel and underwater immersed tube during the installation process of immersed tube tunnel of the Shenzhen-Zhongshan Link,an underwater umbilical cable penetrating and connecting technology was proposed.Through the simulation and testing of key indexes such as underwater sealing performance and load-bearing performance,the results indicate that the system can meet the pressure sealing requirements for water depth of 300 meters and has a tensile resistance of 14 kN.This technology provides effective technical support for the installation of immersed tubes in the Shenzhen-Zhongshan Link,and its reliability has been verified in the installation of the Shenzhen-Zhongshan Link immersed tube tunnel.Meanwhile,it can provide technical reference for the communication connection"between vessel and immersed tube"during installation of immersed tube tunnel in larger water depth in the future.
关 键 词:深水沉管 线缆穿舱 线缆搭接 水密可靠性 深中通道
分 类 号:U655.4[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49