水泥土搅拌墙+钻孔灌注桩在基坑支护中的应用  

THE APPLICATION OF CEMENT SOIL MIXING WALL+DRILLED CA ST-IN-PLACE PILE IN FOUNDATION PIT SUPPORT

在线阅读下载全文

作  者:曾令勇 Zeng Ling-yong

机构地区:[1]湖南省衡洲建设有限公司,湖南衡阳421000

出  处:《建筑技术开发》2024年第9期150-152,共3页Building Technology Development

摘  要:某深大基坑周边环境及地下管线复杂,地质条件相对较差,为保证基坑施工任务的顺利进行,首先对基坑围护结构方案进行比选,然后在施工中对重点工序进行控制,同时加强基坑变形监测,最终完成了基坑施工任务。The surrounding environment and underground pipelines of a certain deep foundation pit are complex,and the geological conditions are relatively poor.In order to ensure the smooth progress of the foundation pit construction task,the first step is to compare and select the retaining structure scheme of the foundation pit.Then,key processes are controlled during construction,and deformation monitoring of the foundation pit is strengthened.Finally,the foundation pit construction task is completed.

关 键 词:水泥土搅拌墙 钻孔灌注桩 基坑稳定性 变形控制 

分 类 号:TU753.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象