检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张传玖 李宣良 贾士耀 杨正义 郭坤勇 许乐 ZHANG Chuanjiu;LI Xuanliang;JIA Shiyao;YANG Zhengyi;GUO Kunyong;XU Le(China Energy Shendong Coal Group Co.,Ltd,Buertai Coal Mine,Ordos,Inner Mongolia 017209,China;China Energy Shendong Coal Group Co.,Ltd.,Shenmu,Shannxi,719315,China;China Coal Mining Research Institute Co.,Ltd.,Beijing 100013,China;School of Resources and Safety Engineering,Chongqing University,Chongqing 400044,China)
机构地区:[1]国能神东煤炭集团有限责任公司布尔台煤矿,内蒙古鄂尔多斯市017209 [2]国能神东煤炭集团有限责任公司,陕西神木市719315 [3]中煤科工开采研究院有限公司,北京100013 [4]重庆大学资源与安全学院,重庆400044
出 处:《矿业研究与开发》2024年第8期104-112,共9页Mining Research and Development
基 金:国家自然科学基金资助项目(52104077);重庆大学煤矿灾害动力学与控制国家重点实验室访问学者资助项目(2011DA105287-FW201903)。
摘 要:为解决多煤层采动层间覆岩破断复杂、难控制等问题,以神东某多煤层矿井为研究背景,通过理论分析、现场监测与数值模拟相结合的研究手段,分析多煤层开采层间覆岩破断特征及运移规律。首先,基于悬臂梁理论分析计算了多煤层采动下层间覆岩移动量,同时将现场监测数据与理论值进行对比分析;然后,采用3DEC模拟研究了多煤层在不同开采距离下层间覆岩运移及破断特征;最后,提出了煤壁锚索+层间覆岩锚网锚杆强化支护技术。结果表明:可利用多煤层开采层间覆岩运移理论计算层间覆岩裂隙发育高度;多煤层开采过程中易采用下行式开采,上、下煤层间距在20~40 m之间最为合适;多煤层采动过程中层间覆岩移动量呈先增加后降低的趋势,相较于普通支护,煤壁锚索+层间覆岩锚网锚杆强化支护的顶板移近量降低了约65%,取得了良好的支护效果。研究结果为多煤层采动条件下顶板稳定性控制提供了理论依据。In order to solve the problems of complex and difficult control of fractures at interlayer overburden rock in multiple coal seams mining,taking a coal mine with multiple seams in Shendong as the research background,the fracture characteristics and migration law of interlayer overburden rock in multiple coal seams mining were analyzed by means of theoretical analysis,field monitoring and numerical simulation.Firstly,based on the cantilever beam theory,the movement of overburden rock in multiple seams mining was calculated,and the field monitoring data were compared with the theoretical values.Then,3DEC simulation was used to study the migration and fracture characteristics of overburden rock between multiple coal seams under different mining distances.Finally,the strengthening support technology combining anchor cable in coal wall with anchor net and bolt in interlayer overburden rock was put forward.The results show that the fracture development height of interlayer overburden rock can be calculated by using the migration theory of interlayer overburden rock in multiple coal seams mining.In the process of multiple coal seams mining,it is easy to adopt downward mining,and the spacing between upper and lower coal seams is the most suitable between 20-40 m.In the process of multiple coal seams mining,the movement value of interlayer overburden rock increases first and then decreases.Compared with ordinary support,the roof compared with the ordinary support,the roof displacement of the coal wall anchor cable+interlayer overlying rock anchor net anchor bolt strengthened support is reduced by about 65%,and good support effect is achieved.The research results provide a theoretical basis for roof stability control under multiple coal seams mining conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7