应用型电子直线加速器用C波段大功率速调管研究与开发  被引量:1

Research and Development of High Power Klystron for C-band Industrial Linear Accelerator

在线阅读下载全文

作  者:杨誉[1] 杨京鹤 王常强 刘秀莹 韩广文[1] 吴青峰[1] 范雨轩 王博 雷瀚 毕振亮 陈伟 崔爱军 于国龙 吕约澎 王国宝[1] 张立锋[1] 朱志斌[1] YANG Yu;YANG Jinghe;WANG Changqiang;LIU Xiuying;HAN Guangwen;WU Qingfeng;FAN Yuxuan;WANG Bo;LEI Han;BI Zhenliang;CHEN Wei;CUI Aijun;YU Guolong;LYU Yuepeng;WANG Guobao;ZHANG Lifeng;ZHU Zhibin(Department of Nuclear Technology and Application,China Institute of Atomic Energy,Beijing 102413,China)

机构地区:[1]中国原子能科学研究院核技术综合研究所,北京102413

出  处:《原子能科学技术》2024年第S01期167-173,共7页Atomic Energy Science and Technology

基  金:中核集团“青年英才”项目。

摘  要:为满足C波段应用型直线加速器功率源要求,研制了一支C波段大功率速调管。通过对电子枪结构模拟计算并利用正反向组合式聚焦线圈调整过渡区磁场,完成了电子光学系统设计,电子注通过率达到100%,电子注波动率为4.8%。综合应用一维至三维计算程序对注-波互作用段开展参数优化及PIC仿真,最终确定了6个谐振腔的速调管方案。腔体加工冷测调配后焊接形成整管,并开展了高功率测试,在电子注电压为115 kV、电流为79.6 A条件下,馈入频率为5712 MHz、功率为100 W的信号时,该速调管可输出的峰值功率为3.52 MW,增益为45.5 dB,效率为38.5%,达到了预期研制目标。In order to meet the power source requirements of C-band linear accelerators for industrial applications,a C-band high power klystron operating at a frequency of 5712 MHz was developed.For this klystron,the development objective of the output power is no less than 3.5 MW and the efficiency is no less than 35%.During the entire design process,the output power was optimized to over 4 MW and the power efficiency over 40%to compensate for the disadvantage effects caused by manufacturing and testing errors in the development processes.Firstly,the electron optics system with a Pierce gun and a combination of five forward and one reverse focusing coils was designed.The Pierce gun with a perveance of 2μP was adopted and the beam voltage and current were chosen as 120 kV and 83.3 A.By iteratively calculating the structure of the electron gun with EGUN code and optimizing the magnetic field between the electron gun and the beam-wave interaction section,the final electron beam pass rate reaches 100%and the fluctuation of the beam envelop is only 4.8%.Secondly,the efficiency optimization and PIC simulation of the beam-wave interaction section were carried out using the one dimensional AJDISK code,1.5 dimensional KlyC code and three dimensional CST code.The scheme of six resonant cavities was ultimately determined and the basic cavity parameters were optimized based on the principles of stagger tuning.The simulation results of different codes all indicate that the efficiency can reach above 46.5%,and the output power can all reach above 4.650 MW.And the influence of frequency errors and output external quality factor on efficiency was also analyzed to guide the manufacturing process.After that,the mechanical structure of cavities was designed and all cavities were manufactured with oxygen free copper.The cold test and tuning of all cavities were carried out and the frequency error is mostly within the range of±5 MHz,which basically does not affect the output power.Finally,the electron gun,the beam-wave interaction section a

关 键 词:C波段 速调管 直线加速器 

分 类 号:TL53[核科学技术—核技术及应用] TN122[电子电信—物理电子学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象