检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田旺 TIAN Wang(Xinhua Hydropower Company Limited,Beijing 100070,China)
出 处:《价值工程》2024年第25期141-143,共3页Value Engineering
摘 要:面板堆石坝蓄水初期的变形监测对于确保工程安全、稳定运行具有重要意义。本文基于阿尔塔什面板堆石坝蓄水初期的变形监测数据,深入分析了坝体在蓄水过程中的变形特性、规律及成因,旨在为类似工程提供借鉴和参考。Deformation monitoring during the initial water storage period of panel-stacked stone dams is crucial for ensuring the safety and stable operation of engineering projects.Based on the deformation monitoring data of the Altashan panel-stacked stone dam during the initial water storage phase,this paper provides an in-depth analysis of the deformation characteristics,patterns,and causes of the dam body during the water storage process.The aim is to offer insights and references for similar engineering projects.
分 类 号:TV641.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49