阿尔塔什面板堆石坝蓄水初期变形监测成果分析  

Analysis of Initial Deformation Monitoring Results for Altashan Panel-stacked Stone Dam Reservoir Storage

在线阅读下载全文

作  者:田旺 TIAN Wang(Xinhua Hydropower Company Limited,Beijing 100070,China)

机构地区:[1]新华水力发电有限公司,北京100070

出  处:《价值工程》2024年第25期141-143,共3页Value Engineering

摘  要:面板堆石坝蓄水初期的变形监测对于确保工程安全、稳定运行具有重要意义。本文基于阿尔塔什面板堆石坝蓄水初期的变形监测数据,深入分析了坝体在蓄水过程中的变形特性、规律及成因,旨在为类似工程提供借鉴和参考。Deformation monitoring during the initial water storage period of panel-stacked stone dams is crucial for ensuring the safety and stable operation of engineering projects.Based on the deformation monitoring data of the Altashan panel-stacked stone dam during the initial water storage phase,this paper provides an in-depth analysis of the deformation characteristics,patterns,and causes of the dam body during the water storage process.The aim is to offer insights and references for similar engineering projects.

关 键 词:面板堆石坝 蓄水初期 监测 分析 

分 类 号:TV641.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象