检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Minjia Tan Qizhou Hu Yikai Wu Juanjuan Lin Xin Fang
机构地区:[1]School of Automation,Nanjing University of Science and Technology,Nanjing 210094,Jiangsu,China
出 处:《Transportation Safety and Environment》2024年第3期47-61,共15页交通安全与环境(英文)
基 金:supported in part by the Key Scientific and Technological projects of Henan Province(Grant No.182102310004);the Postgraduate Research&Practice Innovation Program of Jiangsu Province(Grant No.KYCX19_0304);the scholarship of China Scholarship Council(Grant No.201906840033,202006840084).
摘 要:To address the shortcomings in decision-making methods for ground motion threshold warning models in high-speed rail earthquake early warning systems(HSREEWs),we propose a dual judgement method and corresponding early warning process for earthquake early warning decisions based on joint peak ground acceleration(PGA)and complex earthquake environmental risk evaluation(ERE)values.First,we analyse the characteristics of four complex earthquake environments based on the characteristics of high-speed rail(HSR)operating environments.Second,we establish an earthquake environmental risk evaluation index system and propose an adversarial interpretive structure modelling method-based complex earthquake situation evaluation model(AISM-based ESEM).The AISM method firstly evaluates the proximity by the TOPSIS(technique for order preference by similarity to an ideal solution)method,then effectively rank targets with fuzzy attributes through opposite hierarchical extraction rules without sacrificing system functionality.Since PGA can reflect the current size of earthquake energy,combining PGA thresholds with ESEM-derived values of ERE can effectively determine the risk status of each train and make decisions on the most appropriate alarm form and control measures for that status.Finally,case analysis results under the background of Wenchuan Earthquake show that the new early warning decisionmaking method accurately assesses environmental risks in affected areas and provides corresponding warning levels as a supplement to existing HSREEWs warning models.
关 键 词:high-speed rail(HSR) earthquake situation earthquake risk DECISION-MAKING earthquake early warning
分 类 号:U298[交通运输工程—交通运输规划与管理] P315.9[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7