检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:路朋 陈思捷[2] 张宁[1] 叶林[3] 王程 杜尔顺 汤涌 LU Peng;CHEN Sijie;ZHANG Ning;YE Lin;WANH Cheng;DU Ershun;TANG Yong(Department of Electrical Engineering,Tsinghua University,Haidian District,Beijing 100084,China;Key Laboratory of Control of Power Transmission and Conversion,Ministry of Education(Shanghai Jiao Tong University),Minhang District,Shanghai 200240,China;College of Information and Electrical Engineering,China Agriculture University,Haidian District,Beijing 100083,China;State Key Laboratory of New Energy Power System(North China Electric Power University),Changping District,Beijing 102206,China;State Key Laboratory of Power Gird Safety and Energy Conservation(China Electric Power Research Institute),Haidian District,Beijing 100192,China)
机构地区:[1]清华大学电机工程与应用电子技术系,北京市海淀区100084 [2]电力传输与功率变换控制教育部重点实验室(上海交通大学),上海市闵行区200240 [3]中国农业大学信息与电气工程学院,北京市海淀区100083 [4]新能源电力系统国家重点实验室(华北电力大学),北京市昌平区102206 [5]电网安全与节能国家重点实验室(中国电力科学研究院有限公司),北京市海淀区100192
出 处:《中国电机工程学报》2024年第16期6263-6277,I0001,共16页PROCEEDINGS OF THE CHINESE SOCIETY FOR ELECTRICAL ENGINEERING
基 金:电力传输与功率变换控制教育部重点实验室开放课题(2022AA01);新能源电力系统全国重点实验室开放课题(LAPS23011);新型电力系统运行与控制全国重点实验室开放基金(SKLD23KM02)。
摘 要:间歇性、集群式的风电并入大电网将会增加输电断面功率越限风险,将点预测信息纳入含风电的电力系统调度将不可避免出现“过调度”和“欠调度”。为此,该文提出计及区间预测信息的含风电电力系统有功多时间尺度协调调度优化方法。首先,利用点模型及其预测误差分布构建风电功率区间预测模型;其次,建立具有区间预测信息的风电场有功功率动态分群策略;再次,构建风电集群和自动发电控制(automatic generation control,AGC)机组与非AGC机组等多时间尺度协调的调度策略,通过滚动优化和反馈校正环节协调日前-日内以及实时调度;最后,采用实际风电集群有功功率数据和改进的IEEE-118节点标准测试系统验证所提方法的有效性。研究表明,所提方法不仅可以合理协调风电集群内各个风电场输出功率,还可以协调风电集群功率和AGC机组与非AGC之间的输出功率,有效解决了调度指令与实际输出功率不协调问题。The integration of intermittent,clustered wind power into the grid will increase the risk of the over-limit power transmission sections,and the incorporation of point prediction information into the dispatch of power systems containing wind power will inevitably result in“over-dispatch”and“under-dispatch”.Therefore,a multi-timescale coordinated dispatch approach of wind power cluster based on interval model prediction control is proposed.First,a wind power interval prediction model is developed via using the point prediction model and its prediction error distribution.Second,a wind farm power dynamic grouping strategy with interval prediction information is established.Then,a multi-timescale coordinated dispatch strategy for wind power clusters and automatic generation control(AGC)units and non-AGC units is proposed.Finally,the effectiveness of the proposed method is verified by using actual wind power cluster data and a modified IEEE-118 standard test system.The results show that the proposed method could reasonably coordinate the individual wind power output and the output power of the wind power cluster,AGC units and non-AGC units.
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.190.152.131