检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘刚[1] 郝世缘 胡万君 刘云鹏[1] 李琳[2] LIU Gang;HAO Shiyuan;HU Wanjun;LIU Yunpeng;LI Lin(Hebei Provincial Key Laboratory of Power Transmission Equipment Security Defense(North China Electric Power University),Baoding 071003,Hebei Province,China;State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources(North China Electric Power University),Changping District,Beijing 102206,China)
机构地区:[1]河北省输变电设备安全防御重点实验室(华北电力大学),河北省保定市071003 [2]新能源电力系统国家重点实验室(华北电力大学),北京市昌平区102206
出 处:《中国电机工程学报》2024年第16期6656-6666,I0030,共12页PROCEEDINGS OF THE CHINESE SOCIETY FOR ELECTRICAL ENGINEERING
基 金:国家重点研发计划项目(2021YFB2401700)。
摘 要:针对油浸式电力变压器瞬态温升计算效率过低的问题,该文提出本征正交分解-αATS(proper orthogonal decomposition-adaptive time stepping based onαfactor,POD-αATS)降阶自适应变步长瞬态计算方法。首先,推导变压器绕组瞬态温升计算的有限元离散方程;其次,采用POD降阶算法改善传统瞬态计算中存在的条件数过大及方程阶数过高的问题;同时对于瞬态计算中的时间步长选择问题,提出适用于非线性问题的αATS变步长策略;然后,为验证方法的有效性,基于110 kV油浸式电力变压器绕组的基本结构建立二维八分区数值计算模型,同时将计算结果与基于110 kV绕组的温升实验结果进行对比。数值计算及实验结果表明,所提算法与全阶定步长算法在流场和温度场中的精度几乎相同,且流场计算效率提升约45倍,温度场计算效率提升约38倍,计算速度得到显著提高。这一点在温升实验中同样得到验证,说明该文所提算法的准确性、高效性及一定的工程实用性。In response to the problem of low efficiency in calculating transient temperature rise of oil immersed power transformers,this paper proposes POD-αATS reduced order adaptive variable step size transient calculation method.First,the article briefly derives the finite element discrete equation for calculating the transient temperature rise of transformer windings.Next,the proper orthogonal decomposition(POD)order reduction algorithm is adopted to improve the problems of excessive number of conditions and equation orders in traditional transient calculations.Meanwhile,for the time step selection problem in transient calculations,this paper proposes a method suitable for nonlinear problemsαATS(adaptive time stepping based onαfactor,αATS)variable step size strategy.Then,in order to verify the effectiveness of the method,this paper establishes a two-dimensional eight zone numerical calculation model based on the basic structure of the 110 kV oil-immersed power transformer winding,and compares the calculation results with the temperature rise experimental results based on the 110 kV winding.The numerical calculation and experimental results show that the accuracy of the proposed algorithm is almost the same as that of the full order fixed step algorithm in the flow field and temperature field,the efficiency of flow field calculation is improved by about 45 times,and the efficiency of temperature field calculation is improved by about 38 times,significantly improving the calculation speed.This has also been verified in temperature rise experiments,which fully demonstrates the accuracy,efficiency,and certain engineering practicality of the algorithm proposed in this paper.
关 键 词:αATS变步长算法 本征正交分解降阶方法 瞬态流热耦合问题 快速计算方法 温升实验
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49