检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:付增 范晓冬 魏旭鹏 李鹏 余长益 FU Zeng;FAN Xiaodong;WEI Xupeng;LI Peng;YU Changyi(China Railway Engineering Equipment Group Co.,Ltd.,Zhengzhou 450016;China Railway Industrial Manufacturing Professional R&D Center-Urban Underground Space Development Technology and Equipment R&D Subcenter,Zhengzhou 450016)
机构地区:[1]中铁工程装备集团有限公司,郑州450016 [2]中铁工业制造专业研发中心城市地下空间开发技术与装备研发分中心,郑州450016
出 处:《都市快轨交通》2024年第4期88-95,共8页Urban Rapid Rail Transit
基 金:中国中铁股份有限公司科技研究开发计划课题(2020-重大-10)。
摘 要:为了避免传统明挖法建造地铁车站带来的围挡占道、商铺拆迁、地下管线改迁等诸多负面问题,以广州地铁3号线东延段海傍站为工程背景,对矩形顶管暗挖地铁站建造技术进行研究。首先,提出了3种建造车站的顶管组合方案,并总结3种方案的特点,结合车站工程实际给出优选方案;然后,对车站截面设计、顶管机选型、管节设计和防水设计方案进行介绍;最后,通过理论计算、数值模拟、现场监测等手段验证组合顶管法施工的可行性。结果表明:矩形顶管暗挖地铁站建造技术可以用于下穿管线的地铁车站建设,且安全性高、可实施性强。To address the challenges posed by traditional open-cut methods in subway station construction,such as disruptions,shop demolitions,and relocation of underground pipelines,this study investigates the construction technology of jacking a rectangular tube for a subway station,focusing on the Haibang Station of the Guangzhou Metro Line 3 East extension project.Initially,three different combinations of pipe jacking schemes are proposed,each with unique characteristics tailored to the specific station engineering requirements.Selection among these schemes is based on practical considerations.Subsequently,the study details the section design,selection of jacking equipment,design of pipe sections,and implementation of waterproofing measures for the station.Finally,the feasibility of employing the combined pipe jacking method is validated through theoretical calculations and numerical simulations.The results demonstrate that the construction technology of jacking a rectangular tube for subway stations effectively addresses the challenges associated with underground pipeline integration.It ensures safety and feasibility in subway station construction.This approach offers a promising alternative to traditional methods,potentially minimizing disruptions and optimizing construction efficiency in urban environments.
关 键 词:城市轨道交通 地铁车站 矩形顶管 结构分割法 密贴施工 施工监测
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7