摘  要:针对某矿提升容器脱轨并摩擦辅助罐道问题,采用复轨、纠偏以及降速降载等措施,临时保障了系统运行,但主井降速降载运行后直接影响矿井生产布局。通过静态控制点测量分析、提升系统纠偏、安装辅助引罐道等一系列措施,提升系统恢复至全速满载运行。In view of the problem of derailment of the steel cage shoe in a mine hoisting container,which caused friction to the auxiliary guide,measures such as re-railing,deviation correction and speed reduction and load reduction were adopted to temporarily ensure the operation of the system,but the speed reduction and load reduction of the main shaft directly affected the production layout of the mine.As a result,through a series of measures such as static control point measurement and analysis,hoisting system correction,and installation of auxiliary lead cage guide,the hoisting system was restored to full speed and full load operation.

关 键 词:提升系统 静态控制点 纠偏 辅助引罐道 

分 类 号:TD531[矿业工程—矿山机电] TD541

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象