检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘翔[1,2] 曹体涛 刘成龙[1,2] 杨雪峰[1,2] 赖俊臣 LIU Xiang;CAO Titao;LIU Chenglong;YANG Xuefeng;LAI JunCheng(Faculty of Geosciences and Engineering,Southwest Jiaotong University,Chengdu 611756,China;State-Province Joint Engineering Laboratory in Spatial Information Technology for High-speed Railway Safety,Chengdu 611756,China;China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]西南交通大学地球科学与工程学院,成都611756 [2]高速铁路运营安全空间信息技术国家地方联合工程实验室,成都611756 [3]中铁二院工程集团有限责任公司,成都610031
出 处:《铁道勘察》2024年第4期78-84,共7页Railway Investigation and Surveying
基 金:中央高校基本科研业务费科技创新项目(2682023CX013);中铁二院工程集团有限责任公司科研项目重点课题(KSNQ213012)。
摘 要:目前,正在建设的成渝中线高铁预留有时速400 km的条件,为研究具有自主知识产权且能够满足更高速度高铁轨道平顺性测控精度要求的CPⅢ平面网优化网形,提出4种优化CPⅢ测量网形,用以提高测量精度。为验证优化后网形相较于标准自由测站边角交会网的相对点位精度增益情况,设计仿真计算实验。模拟计算5种平面控制网(标准CPⅢ平面网+4种优化网)相邻点相对点位中误差和最弱点点位中误差。其中,对5种平面控制网分别模拟1 km、4 km两种长度各100组,并与对应的小范围实测结果进行对比分析。研究表明,提出的CPⅢ平面网Ⅱ类和Ⅳ类优化网形相邻点相对点位中误差较标准网提高约30%,Ⅰ类优化网形相邻点相对点位中误差较标准网提高约10%,前者可用于更高速度高铁的CPⅢ平面网测量,后者对于提高现行CPⅢ平面网的精度和可靠性效果显著。At present,the Chengdu-Chongqing High-speed Railway under construction has a speed increase space of 400 km/h.In order to study the CPⅢplane network optimization network with independent intellectual property rights and meet the requirements of higher speed high-speed rail track smoothness measurement and control accuracy,four optimized CPⅢmeasurement network shapes were proposed to improve the measurement accuracy.To verify the relative point accuracy gain of the optimized network shape compared with the standard free station side-angle intersection network,a simulation calculation experiment was designed.Five kinds of plane control network(standard CPⅢplane network+four kinds of optimization network)adjacent point relative error and the weakest point error were simulated and calculated.Among them,100 groups of 1 km and 4 km lengths were simulated for 5 kinds of plane control networks,and compared with the corresponding small-scale measured results.The research shows that,the relative error of the adjacent points of typeⅡand type IV optimized network is about 30%higher than that of the standard network,and the relative error of the adjacent points of the I optimized network is about 10%higher than that of the standard network.The former can be used for CPⅢplane network measurement of higher speed high-speed railway,and the latter also has a significant effect on improving the accuracy and reliability of the current CPⅢplane network.
关 键 词:高速铁路 CPⅢ控制网 网形优化 仿真计算 相对点位精度
分 类 号:U238[交通运输工程—道路与铁道工程] U212.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195