作 者:任小恩 REN Xiaoen(Guangdong Guanyue Highway and Bridge Co.,Ltd.,Guangzhou 511450,Guangdong,China)
出 处:《广东交通职业技术学院学报》2024年第3期21-28,共8页Journal of Guangdong Communication Polytechnic
摘 要:以马兰大桥老桥为工程背景,针对旧桥拆除的施工过程,给出一种利用移动式桥面吊机拆除施工中箱梁的新方法。在确定T构和主桥的拆除施工工艺及流程后,通过数值计算测得T构拆除过程中桥墩应力理论值,并将理论值与现场监测的实测进行对比。通过理论受力分析和实桥应力监测数据的详细对比,验证了本项目研究提出的主桥拆除技术方法与理想设计情况一致,所得施工技术方案具有良好的可行性与有效性。Taking the old Malan Bridge as the engineering background,a new method of using a mobile bridge deck crane for the lifting of box beams during the demolition construction of old bridges was proposed.After the demolition construction process and process of the T-structure and main bridge were determined,the theoretical stress values of the bridge piers during the T-structure demolition process were measured through numerical calculations.The theoretical values were compared with on-site monitoring measurements.Finally,through theoretical stress analysis and detailed comparison of actual bridge stress monitoring data,it was verified that the main bridge demolition technology proposed in this research is consistent with the ideal design situation,and the obtained construction technology scheme has good feasibility and effectiveness.
关 键 词:T型钢构 桥梁拆除 数值模型 应力监测 施工流程
分 类 号:U455.6[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.22.202