检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:ZHOU Xiang-bo QIAO Dong-sheng WANG Ming TANG Guo-qiang LU Lin OU Jinping
出 处:《China Ocean Engineering》2024年第4期676-688,共13页中国海洋工程(英文版)
基 金:financially supported by the National Key Research and Development Program of China(Grant No.2022YFB2602800);Science and Technology Projects of Liaoning Province(Grant No.2023011352-JH1/110)。
摘 要:The Submerged Floating Tunnel(SFT)relies on a tensioned mooring system for precise positioning.The sudden breakage of a single cable can trigger an immediate alteration in the constraint conditions of the tube,inducing a transient heave response within the structure along with a transient increase in cable tension experienced by adjacent cables.In more severe cases,this may even lead to a progressive failure culminating in the global destruction of the SFT.This study used ANSYS/AQWA to establish a numerical model of the entire length SFT for the hydrodynamic response analysis,and conducted a coupled calculation of the dynamic responses of the SFT-mooring line model based on Orca Flex to study the global dynamic responses of the SFT at the moment of cable breakage and the redistribution of cable internal forces.The most unfavorable position for SFT cable breakage was identified,the influence mechanism of cable breakage at different positions on the global dynamic response was revealed,and the progressive chain failure pattern caused by localized cable breakage are also clarified.
关 键 词:submerged floating tunnel cable breakage global dynamic responses progressive failure
分 类 号:U459.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49