检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋建威[1] SONG Jianwei(Sinohydro Bureau 5 Co.,LTD.,Chengdu Sichuan 610066)
机构地区:[1]中国水利水电第五工程局有限公司,四川成都610066
出 处:《四川水力发电》2024年第4期17-21,共5页Sichuan Hydropower
摘 要:在Lombardi博士的GIN理论基础上,结合世界大坝委员会的坝基设计公报及以往国际水电站工程采用GIN灌浆取得的经验,依托科特迪瓦波波里水电站土石坝帷幕灌浆的实践,阐述了基于坝基岩石质量与压水试验成果的GIN设计值的取值方法,提出了P_(max)、V_(max)值设计时需要考虑的两种边界条件,并通过理论公式计算及实践经验提出了浆液扩散半径的安全保证系数。On the basis of Dr.Lombardi's GIN theory,combined with the ICOLD bulletin concerning the foundation of dam and the GIN grouting experience of previous international hydropower projects,this paper relies on the curtain grouting practice of the earth-rock fill dam of the Gribo-Poboli Hydropower project in Cote d'Ivoire,and improves the GIN value design method based on the dam foundation rock quality and Lugeon water test results.Two extreme boundary conditions which should be considered in the design of P_(max)and V_(max)values are proposed,and the research process safety guarantee factor of slurry diffusion radius is proposed basing on theoretical formula calculation and practical experience.
关 键 词:国际工程 水电站 土石坝 GIN 帷幕灌浆 稳定浆液 设计方法
分 类 号:TV7[水利工程—水利水电工程] TV543TV543.16TV543.18
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.228.99