检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张达志 任小强[1] 赵俊松 任浩 赵耀 ZHANG Dazhi;REN Xiaoqiang;ZHAO Junsong;REN Hao;ZHAO Yao(Sinohydro Bureau 5 Co.,LTD.,Chengdu Sichuan 610066)
机构地区:[1]中国水利水电第五工程局有限公司,四川成都610066
出 处:《四川水力发电》2024年第4期27-31,45,共6页Sichuan Hydropower
摘 要:高速铁路预制箱梁冬期施工具有成本高、施工难度大、温度控制难等特点。结合莱荣铁路海阳制梁场预制箱梁冬期施工的实际情况,阐述了高速铁路预制箱梁冬期施工时使用的蒸养设备、蒸养工艺及操作要点,并对蒸养温度进行了分析与总结,所取得的经验可为类似工程施工借鉴。The high-speed railway prefabricated box girder in the winter construction is characterized by high cost,great construction difficulty,difficult temperature control.Combined with the prefabricated box girder winter construction of Lairong Railway Haiyang Beam Field,this paper introduces high-speed railway prefabricated box girder winter construction steam equipment,steam technology and operation points,and the steam temperature analysis and summary,and provides useful reference for similar engineering construction.
关 键 词:莱荣铁路 海阳制梁场 高速铁路 冬期施工 蒸汽养护 温度控制 预制箱梁
分 类 号:U215.1[交通运输工程—道路与铁道工程] U215.7U238
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3