煤矿工作面设备安装与回撤工艺分析  

Analysis of Installation and Withdrawal Process of Coal Mine Working Face Equipment

在线阅读下载全文

作  者:程帆 史忠普 周博 CHENG Fan;SHI Zhongpu;ZHOU Bo(Zaozhuang Mining(Group)Co.,Ltd.,Jiangzhuang Coal Mine,Zaozhuang 277519)

机构地区:[1]枣庄矿业(集团)有限责任公司蒋庄煤矿,枣庄277519

出  处:《现代制造技术与装备》2024年第8期132-134,共3页Modern Manufacturing Technology and Equipment

摘  要:煤矿工作面设备的安装与回撤是煤矿生产过程中的重要环节。文章深入研究煤矿工作面设备的安装与回撤工艺。在安装工艺方面,详细分析顶板支护安装、输送机铺设和采煤机安装等关键环节;在回撤工艺方面,着重探讨回撤顺序与调度、设备拆卸过程以及地面存放与转运要求,以期为提高煤矿工作面设备安装与回撤的效率与安全性提供有价值的参考。The installation and withdrawal of coal mine working face equipment is an important link in coal mine production process.The paper deeply studies the installation and withdrawal technology of coal mine working face equipment.In terms of installation technology,the key links such as roof support installation,conveyor laying and shearer installation are analyzed in detail.In terms of pullback technology,the paper focuses on the pullback sequence and scheduling,equipment disassembly process and ground storage and transfer requirements,in order to provide a valuable reference for improving the efficiency and safety of equipment installation and pullback in coal mine working face.

关 键 词:煤矿工程 工作面设备 安装 回撤 

分 类 号:TD407[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象