A PI+R Control Scheme Based on Multi-Agent Systems for Economic Dispatch in Isolated BESSs  

在线阅读下载全文

作  者:Yalin Zhang Zhongxin Liu Zengqiang Chen 

机构地区:[1]College of Artificial Intelligence,Nankai University,Tianjin 300350 [2]Tianjin Key Laboratory of Interventional Brain-Computer Interface and Intelligent Rehabilitation,Nankai University,Tianjin 300350,China [3]IEEE

出  处:《IEEE/CAA Journal of Automatica Sinica》2024年第10期2154-2165,共12页自动化学报(英文版)

基  金:supported by the National Natural Science Foundation of China(62103203);the General Terminal IC Interdisciplinary Science Center of Nankai University.

摘  要:Battery energy storage systems(BESSs)are widely used in smart grids.However,power consumed by inner impedance and the capacity degradation of each battery unit become particularly severe,which has resulted in an increase in operating costs.The general economic dispatch(ED)algorithm based on marginal cost(MC)consensus is usually a proportional(P)controller,which encounters the defects of slow convergence speed and low control accuracy.In order to solve the distributed ED problem of the isolated BESS network with excellent dynamic and steady-state performance,we attempt to design a proportional integral(PI)controller with a reset mechanism(PI+R)to asymptotically promote MC consensus and total power mismatch towards 0 in this paper.To be frank,the integral term in the PI controller is reset to 0 at an appropriate time when the proportional term undergoes a zero crossing,which accelerates convergence,improves control accuracy,and avoids overshoot.The eigenvalues of the system under a PI+R controller is well analyzed,ensuring the regularity of the system and enabling the reset mechanism.To ensure supply and demand balance within the isolated BESSs,a centralized reset mechanism is introduced,so that the controller is distributed in a flow set and centralized in a jump set.To cope with Zeno behavior and input delay,a dwell time that the system resides in a flow set is given.Based on this,the system with input delays can be reduced to a time-delay free system.Considering the capacity limitation of the battery,a modified MC scheme with PI+R controller is designed.The correctness of the designed scheme is verified through relevant simulations.

关 键 词:Battery energy storage system(BESS) distributed control economic dispatch multi-agent system reset control 

分 类 号:TM912[电气工程—电力电子与电力传动] TP273[自动化与计算机技术—检测技术与自动化装置]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象