城市美术馆项目投资估算及设计概算控制方法研究——以无锡美术馆建设项目为例  被引量:1

Research on Investment Estimation and Design Budget Control Methods for Urban Art Museum Projects——Taking the Wuxi Art Museum Construction Project as an Example

在线阅读下载全文

作  者:杨爱萌 吴奇威 杨宇昕 Yang Aimeng;Wu Qiwei;Yang Yuxin(Jianjing Investment&Consulting Co.Ltd.,Jiangsu Branch,Wuxi 214000,China;Wuxi Municipal Government Investment Evaluation Center,Wuxi 214000,China;Nanjing Audit University,Nanjing 211815,China)

机构地区:[1]建经投资咨询有限公司江苏分公司,江苏无锡214000 [2]无锡市政府投资评审中心,江苏无锡214000 [3]南京审计大学,江苏南京211815

出  处:《工程造价管理》2024年第4期62-66,共5页Engineering Cost Management

摘  要:美术馆是集展览、收藏、学术研究与公共教育于一体的文化项目。其设计在体现公益性文化建设特点的同时,也彰显地域文化的独特个性。美术馆投资测算有别于办公用房、住宅项目。各级造价主管部门很少有美术馆项目造价指标数据的统计,缺乏项目参考案例,这是投资估算前期测算的难点。作为城市的地标,美术馆往往外观立意独特,并且还涉及布展及专项工程设计,这些都给美术馆项目概算造价控制增加了困难。美术馆项目概算造价控制,需要造价人员对建设方案更多的技术思考,通过技术经济比较,提出造价优化的建议。文章以无锡美术馆项目为例,详细介绍了类似公建项目投资估算的测算方法及初步设计阶段造价控制的思路,为类似项目提供借鉴。An art museum is a cultural project that integrates exhibitions,collections,academic research,and public education.The project design of the art museum not only reflects the characteristics of public welfare cultural construction,but also highlights the unique personality of regional culture.The investment calculation of art museums is different from office buildings and residential projects.Cost management departments at all levels rarely have statistical data on cost indicators for art museum projects,and there is a lack of project reference cases,which is a difficult point in the early stage of investment estimation calculation.As a landmark of a city,art museums often have unique appearances and designs,as well as exhibition arrangements and specialized engineering designs,which increase the difficulty of cost estimation and control for art museum projects.The cost control of art museum project estimation requires cost personnel to have more technical thinking on the construction plan,and through technical and economic comparison,propose suggestions for cost optimization.The article takes the Wuxi Art Museum project as an example to introduce in detail the calculation method of investment estimation for similar public construction projects and the ideas of cost control in the preliminary design stage,providing reference for similar projects.

关 键 词:投资估算 设计概算 控制方法 

分 类 号:F426[经济管理—产业经济] TU-9[建筑科学]

 