高速公路沥青拌和站设备的安装与调试  

Installation and Commissioning of Asphalt Mixing Plant Equipment on Highway

在线阅读下载全文

作  者:苏元龙 SU Yuan-long(Gansu Shunda Road Bridge Construction Co.Ltd.,Lanzhou 730050,China)

机构地区:[1]甘肃顺达路桥建设有限公司,兰州730050

出  处:《工程建设与设计》2024年第16期167-169,共3页Construction & Design for Engineering

摘  要:探讨了高速公路沥青拌和站设备安装前的关键准备工作,包括设备运输和存储、现场条件准备,以及安全措施和要求;介绍了设备安装的具体步骤,包括从基础建设和布局规划到主要设备组件、电气设备和控制系统的安装;讨论了设备调试过程,包括初步调试、生产调试以及性能检验和优化,确保设备的高效稳定运行。The key preparation work before the installation of asphalt mixing station equipment is discussed,including equipment transportation and storage,site condition preparation,and safety measures and requirements.The concrete steps of equipment installation are introduced,from infrastructure construction and layout planning to installation of main equipment components,electrical equipment and control system.The debugging process of the equipment,including preliminary debugging,production debugging,performance inspection and optimization,is discussed to ensure the efficient and stable operation of the equipment.

关 键 词:高速公路 沥青 拌和站 设备 安装与调试 

分 类 号:U415.5[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象