检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:解李杨 应祎平[1] XIE Liyang;YING Yiping(East China Electric Design Institute Co.,Ltd of China Power Engineering Consulting Group.Shanghai,200063,China)
机构地区:[1]中国电力工程顾问华东电力设计院有限公司,上海200063
出 处:《电力勘测设计》2024年第S01期71-75,共5页Electric Power Survey & Design
摘 要:将脱硫废水引入湿式除渣系统进行综合处理,使脱硫废水排放得到合理解决。本文通过两个脱硫废水接入刮板捞渣机渣水系统的案例调研,分析了脱硫废水引入湿式除渣系统的可行性。并以此为基础在某工程设计中进行了推广应用,据调研发现其投产一年多后运行情况良好,各项指标符合要求,证明脱硫废水引入湿式除渣系统是完全可行的。To introduce desulfurization wastewater in wet slag removal system for overall processing may reasonably solve desulfurization wastewater discharge problem.Therefore,this paper analyzes the feasibility of introducing desulfurization wastewater into wet slag removal system through case study of two desulfurization wastewater connected to SSC slag water system.Based on this,it has been popularized and applied in a certain engineering design.According to the survey,it has been in good operation for more than one year after putting into operation,and the indexes meet the requirements,which proves that it is completely feasible to introduce wet slag removal system into desulphurization wastewater.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.106.159