检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴长发 刘凯 侯宇飞 冯沛 张帅 WU Changfa;LIU Kai;HOU Yufei;FENG Pei;ZHANG Shuai(China Railway Design Corporation,Tianjin 300308,China;China Railway Shanghai Engineering Bureau Group Co.Ltd.,Shanghai 200436,China)
机构地区:[1]中国铁路设计集团有限公司,天津300308 [2]中铁上海工程局集团有限公司,上海200436
出 处:《铁道建筑》2024年第8期65-71,共7页Railway Engineering
基 金:中国国家铁路集团有限公司科技研究开发计划(P2018G004);河北雄安新区科技开发项目(雄安规建办202109)。
摘 要:对于高速铁路装配式一体化桥梁,含上部结构预制箱梁装配式桥面系和下部结构装配式桥墩及大直径预应力高强混凝土(Prestressed High-strength Concrete,PHC)管桩,国内外高速铁路桥梁尚无一体化应用先例。以京雄城际铁路为工程背景,开展桥梁装配式一体化设计建造关键技术应用实践,从各装配式结构的设计方案、施工工艺及现场试验验证等方面开展研究。对全装配式桥梁与邻近常规工法施工桥梁的运营性能进行了检测,结果表明装配式一体化桥梁结构完全满足高速铁路运行安全性、平稳性等方面要求,结构安全可靠。The high speed railway prefabricated integrated bridge includes the upper structure prefabricated box girder prefabricated bridge deck system,lower structure prefabricated bridge piers,and large-diameter prestressed high-strength concrete(PHC)pipe piles.There is no precedent for integrated application of high speed railway bridges at home and abroad.Based on the actual engineering background of the Jingxiong Intercity Railway,key technology application practices for integrated design and construction of bridge assembly were carried out,and research was conducted from the design schemes,construction processes,and on-site test verification of various assembly structures.A comparative analysis was conducted on the operational performance testing of fully assembled bridges and adjacent conventional construction bridges.The results showed that the integrated prefabricated bridge structure fully meets the requirements of high speed railway operation safety,stability,and other aspects,and the structure is safe and reliable.
关 键 词:高速铁路 装配式一体化桥梁 装配式桥面系 装配式桥墩 PHC管桩 运营性能检测
分 类 号:U448.218[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7