简析重力式方块码头的安装施工  

Installation of Structural Blocks for Gravity Berth

在线阅读下载全文

作  者:张晋源 刘玉亮 孙世海 Zhang Jinyuan;Liu Yuliang;Sun Shihai(NO.5 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Qinhuangdao Hebei 066000,China)

机构地区:[1]中交一航局第五工程有限公司,河北秦皇岛066000

出  处:《港口航道与近海工程》2024年第S01期33-36,共4页Port,Waterway and Offshore Engineering

摘  要:预制方块安装技术是一项关键的建筑施工技术,在项目中,我们不断优化安装过程,施工期间解决了如精准度、连接稳固性等一系列施工难题。通过系统的安全和质量保证措施,项目确保了高质量完成安装任务,并达到了预期效果。这不仅为项目的顺利进行提供了保障,其成功经验也将成为未来施工的指导,为如何提高施工效率、保障安全和降低成本提供了可靠的基础。Prefabricated block installation technology is a key construction technology.During the project construction,the port engineers hanv continuously optimized the installation process and solved a series of construction problems such as accuracy and connection stability during the construction period.Through systematic safety and quality assurance measures,it is ensured that the installation tasks were completed with high quality and the expected results were achieved.This not only provides guarantee for the smooth progress of the project,but its successful experience will also become a guide for future construction,providing a reliable basis for the improvement of the construction efficiency,ensuring safety and reducing the cost.

关 键 词:方块安装 施工工艺 质量保证 

分 类 号:U655.4[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象