特殊气候条件下重力式码头方块预制施工技术  

Application of gravity wharf block prefabrication technology under special climate conditions in West Africa

在线阅读下载全文

作  者:邢启超 曾思宁 孙世海 Xing Qicha;Zeng Sining;Sun Shihai(NO.5 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Qinhuangdao Hebei 066000,China)

机构地区:[1]中交一航局第五工程有限公司,河北秦皇岛066000

出  处:《港口航道与近海工程》2024年第S01期37-40,共4页Port,Waterway and Offshore Engineering

摘  要:在加纳塔克拉底油气服务码头项目建设过程中,针对西部非洲地区的气候条件,成功应用了重力式方块码头的方块预制施工技术。特别解决了高温湿热条件下混凝土块体预制施工质量问题,为类似气候条件下的重力式方块码头的施工提供了宝贵经验。这一案例为如何在热带气候下有效地施工重力式方块码头混凝土方块预制提供了可靠的参考和指导。During the construction of the Taklade oil and gas service terminal project in Ghana,the square prefabricated construction technology of the gravity square terminal was successfully applied according to the climatic conditions in West Africa.It particularly solves the construction quality problem of concrete block prefabrication under high temperature and humidity conditions,and provides valuable experience for the construction of gravity-type block piers under similar climate conditions.This case provides a reliable reference and guidance on how to effectively construct concrete block precast gravity block piers in tropical climates.

关 键 词:方块码头 方块预制 混凝土降温 

分 类 号:TU755[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象