辛克雷水电站引水防沙体系设计  

Design of Water Diversion and Sand Prevention System for Sinclair Hydropower Station

在线阅读下载全文

作  者:刘许超 肖豫 孙培翔 刘凯 LIU Xuchao;XIAO Yu;SUN Peixiang;LIU Kai(Yellow River Engineering Consulting Co.,Ltd.,Zhengzhou 450003,China)

机构地区:[1]黄河勘测规划设计研究院有限公司,河南郑州450003

出  处:《红水河》2024年第4期6-9,共4页

摘  要:辛克雷水电站所在河流含沙量大、电站水头高,泥沙对水库有效库容和水轮机磨蚀影响较大。针对工程突出的泥沙问题,根据“正向泄洪冲沙、侧向引水”的思路开展电站引水防沙体系设计,通过综合采用首部枢纽“四道防线”减淤排沙、水库拦沙及机械清淤等措施,使进入压力管道的泥沙含量达到设计含沙量的控制要求。设计方案可为同类型工程提供借鉴。The river where the Sinclair Hydropower Station is located has a high sediment content and a high water head,which has a significant impact on the effective storage capacity of the reservoir and the erosion of the turbines.In view of the prominent sediment problems in the project,the design of the water diversion and sand prevention system of the power station is carried out according to the idea of“flood discharge and sand flushing from the front,water diversion from the side”.Through the comprehensive use of the“four lines of defense”of the head hub to reduce silt and discharge sediment,reservoir sediment interception and mechanical dredging,the sediment content entering the pressure pipe can meet the control requirements of the designed sediment content.The design scheme can provide reference for similar projects.

关 键 词:引水防沙 取水口 沉沙池 冲沙闸 机械清淤 辛克雷水电站 

分 类 号:TV732[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象