检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:樊建峰 林运胜 周熙 FAN Jianfeng;LIN Yunsheng;ZHOU Xi(China Anneng Group First Engineering Bureau Co.,Ltd.,Nanning 530200,China)
机构地区:[1]中国安能集团第一工程局有限公司,广西南宁530200
出 处:《红水河》2024年第4期90-93,共4页
摘 要:为解决大体积混凝土冬季施工存在的物理力学性能降低、黏结力下降等问题,以辽宁鞍山海城150 MW风电项目为例,笔者分析大体积混凝土冬季施工难点,探讨施工技术要点及优化措施。通过采用二次投料法抗冻混凝土搅拌工艺、低温抗冻泵送混凝土运输和浇筑技术,做好抗冻混凝土养护,能够有效保证混凝土施工质量。In order to solve the problems such as the decrease of physical and mechanical properties and the decrease of cohesive force in winter construction of mass concrete,taking the 150 MW wind power project in Haicheng,Anshan,Liaoning as an example,the authors analyze the difficulties in winter construction of mass concrete,and discuss the key points of construction technology and optimization measures.Through the use of secondary feeding method for frost-resistant concrete mixing process,low temperature frost-resistant pumping concrete transportation and pouring technology,do a good job of frost-resistant concrete maintenance,which can effectively ensure the quality of concrete construction.
关 键 词:大体积混凝土 冬季施工 施工技术 风机基础 风电场
分 类 号:TU755.8[建筑科学—建筑技术科学] TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227