检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭嘉羽 王金良[1] 邓超[1] 赵伊楠 齐婷[1] GUO Jia-yu;WANG Jin-liang;DENG Chao;ZHAO Yi-nan;QI Ting(Peking University Third Hospital)
机构地区:[1]北京大学第三医院
出 处:《医院管理论坛》2024年第6期81-85,80,共6页Hospital Management Forum
摘 要:本文聚焦医院中最常见且规模最大的医学影像设备屏蔽防护工程项目,分析其建设过程普遍存在的问题。从建设方视角,基于精益建造的管理理论,构建“浪费识别与优化”模型,并从流程优化、协同管理、需求牵引、界面重置四个方面进行优化。通过项目实践成功达到了预定的管理评估指标,验证了该优化方案的有效性。This paper focuses on the most common and largest shielding protection project of medical imaging equipment in hospitals,and analyzes the common problems in its construction process.From the perspective of the construction side,based on the management theory of lean construction,the"waste identification and optimization"model was constructed,and the optimization was carried out from four aspects:process optimization,collaborative management,demand traction,and interface reset.Through the project practice,the predetermined management evaluation index has been successfully achieved,which verifies the effectiveness of the optimization scheme.
分 类 号:R197.3[医药卫生—卫生事业管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49