检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈富健 CHEN Fu-jian(Weng'an Tianyi Mining Co.,Ltd,Qiannan 550400,China)
机构地区:[1]瓮安县天一矿业有限公司,贵州黔南550400
出 处:《世界有色金属》2024年第12期226-228,共3页World Nonferrous Metals
摘 要:矿山竖井工程是一项复杂且系统工程,具有投资大、风险高、生命周期长等特点。针对矿山竖井工程施工质量控制工作,需要在明确质量控制必要性的基础上,合理分析施工期间出现的质量问题,并结合矿山竖井工程施工现场情况与要求,从工程测量、开挖爆破、材料选择等角度出发,制定可行、合理的质量控制对策,保证现存问题在科学处理的同时,施工质量能满足设计要求。Mine shaft engineering is a complex and systematic project,characterized by high investment,high risk,and long life cycle.Regarding the quality control work of mining shaft engineering construction,it is necessary to clarify the necessity of quality control,reasonably analyze the quality problems that occur during the construction period,and combine the situation and requirements of the mining shaft engineering construction site.From the perspectives of engineering measurement,excavation blasting,material selection,etc.,feasible and reasonable quality control measures should be formulated to ensure that existing problems can be scientifically addressed while the construction quality can meet the design requirements.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7