检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:訾天亮 庞金龙 ZI Tianliang;PANG Jinlong(China Water Resources Beifang Investigation,Design and Research Co.Ltd.,Tianjin,300222)
机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222
出 处:《水利水电工程设计》2024年第3期69-72,共4页Design of Water Resources & Hydroelectric Engineering
摘 要:为研究浙江省庆元抽水蓄能电站技术经济合理的装机容量指标,着重分析了浙江省抽水蓄能电站需求空间及本工程的建设条件等主要影响因素,拟定了3个装机容量方案,重点针对工程布置方案、电力系统作用及经济指标等方面开展技术经济综合比较,以技术经济优、电力系统贡献大为原则,提出了推荐方案。研究思路可为同类型抽水蓄能电站装机容量选择提供参考。To study the technically and economically optimal installed capacity for the Qingyuan Pumped Storage Power Station in Zhejiang Province,this study analyzes the primary influencing factors,including the demand space for pumped storage power stations in Zhejiang Province and the construction conditions of this project.Three installed capacity schemes are proposed and a comprehensive techno-economic comparison is conducted,focusing on project layout,power system contributions,and economic indicators.Based on the principles of technical and economic superiority and significant power system contribution,a recommended scheme is proposed.The research approach can provide reference for the selection of installed capacity for similar types of pumped storage power stations.
关 键 词:装机容量选择 抽水蓄能电站需求空间 工程建设条件 技术经济比较
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.251.131