检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦仁坤 QIN Renkun(Majiang County Municipal Engineering Management Co.,Ltd.,Qiandongnan 557600,China)
机构地区:[1]麻江县市政工程管理有限公司,贵州黔东南557600
出 处:《中国厨卫》2024年第8期294-296,314,共4页Chinese Kitchen & Bathroom
摘 要:基于BIM技术的塔吊布置具有可视化、优化性、模拟性等优点。因此,文章以某工程为例,研究了基于BIM技术的多塔使用的安全管理,涉及塔吊作业过程可视化管理、塔吊使用安全技术交底和教育培训、塔吊吊装安全管理等内容。实践证明,使用BIM技术开展工程作业多塔布置工作,极大地降低了群塔作业时的碰撞风险和吊装风险,提高了现场安全管理速率,具备推广价值。Tower crane layout based on BIM technology has advantages such as visualization,optimization,and simulation.Therefore,the article takes a certain project as an example to study the safety management of multi tower use based on BIM technology,involving visual management of tower crane operation process,safety technology disclosure and education training for tower crane use,and safety management of tower crane lifting.Practice has proven that using BIM technology for multi tower layout in engineering operations greatly reduces collision and lifting risks during tower group operations,improves on-site safety management speed,and has promotional value.
分 类 号:TU714[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222