检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:洪惠卿 HONG Huiqing
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2024年第8期86-88,97,共4页Urban Roads Bridges & Flood Control
摘 要:以某城市高架桥梁为算例,针对钢-混组合桥面板中的配筋问题,建立闭口钢箱-混凝土桥面梁段的实体有限元模型,分析混凝土桥面板中的纵横向钢筋在不同间距的排布情况下,钢桥面板与钢筋的应力分布情况。结果表明,钢桥面板与混凝土桥面板之间存在内力相互分配的关系,横向钢筋间距的变化会影响组合桥面板的内力分配比例;桥面板下排的纵向钢筋应力水平始终较低,且对钢筋间距变化不敏感,可适当进行优化设计,减少其用量。Taking an urban elevated bridge as an example,aiming at the problem of reinforcement arrangement in steel-composite bridge deck,the solid finite element model of beam section of closed steel box-concrete bridge deck is established.The stress distribution between the steel bridge deck and the steel bar in the concrete bridge deck under different spacing arrangement of vertical and horizontal rebar is analyzed.The research shows that the internal force distribution relationship exists between steel bridge deck and concrete bridge deck.The variation of transverse reinforcement spacing will affect the internal force distribution ratio of composite bridge deck.The stress of the longitudinal reinforcement bars in the lower row of the bridge deck is always low,and it is not sensitive to the change of reinforcement bar spacing,which can be properly optimized and designed to reduce its dosage.
分 类 号:U448.21[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49