检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王林 高程鹏 WANG Lin;GAO Chengpeng
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2024年第8期195-199,共5页Urban Roads Bridges & Flood Control
摘 要:通过结合实际工程案例,分析了承压含水层降水后,承压水位的变化趋势,及降水对地面沉降与现状道路沉降的影响。通过数值模拟建立了存在局部深坑的综合基坑的降水方案模型,分析结果表明:通过在局部深坑处设置止水帷幕可将深坑内降水井数目减少一半,坑边地面沉降值减少约53%,现状路面沉降减少约23%;同时,止水帷幕进入坑底以下10 m后,坑底水位方可满足降水要求;但该深度大于10 m后再加深止水帷幕对坑底及坑边承压水位降深影响逐渐减小。因此,推荐降水方案为在局部深坑处设置止水帷幕,帷幕进入坑底以下10 m。In this paper,the variation trend of underground water level and ground subsidence after dewatering were analysed combined with engineering case.The analytic target of this paper was a comprehensive foundation pit with local deep pits.By means of numerical simulation,the dewatering scheme model of the foundation pit was established.The analysis results showed that by setting waterproof curtain around the local deep pit,the number of dewatering wells in the deep pit can be reduced by one time,the ground settlement can be reduced by about 53%,and the road settlement around the pit can be reduced by about 23%.Meanwhile,the dewatering requirements can be met after the waterproof curtain enters 10 m below the pit bottom.However,when the depth was greater than 10 m,the influence of the water stop curtain on the bearing water level at the bottom and edge of the pit decreased gradually.Therefore,the recommended dewatering Scheme for this foundation pit was to set the waterproof curtain around the local deep pit,and the curtain entered 10 m below the pit bottom.The calculation and analysis process in this paper can provide reference for similar projects in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91