检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王文忠 WANG Wenzhong
出 处:《中国矿山工程》2024年第4期83-86,共4页China Mine Engineering
摘 要:随着矿山开采深度的不断增加,高水压给矿山生产带来巨大的挑战,高水压防水闸门在工程中将越来越普遍,井下防水闸门作为防止透水事故的重要安全设施,被越来越多的企业重视并应用于生产。本文以7.5 MPa防水闸门硐室设计为例,进行了结构设计,泄水方式选择等问题的探讨,为后续相似工程积累了经验。With the continuous increase of mining depth,high water pressure brings great challenge to mine production,high water pressure waterproofing gate will be more and more popular in engineering,and underground waterproofing gate is an important safety facility to prevent water penetration accident,more and more enterprises pay attention to and apply in production.Taking the chamber design of 7.5 MPa waterproofing gate as an example,the author discusses the problems of structural design and the selection of discharge mode,and accumulates experience for the following similar projects.
分 类 号:TD744[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49