检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨腾 梁文亭 滕先博 Yang Teng;Liang Wenting;Teng Xianbo(Shougang Jingtang Iron&Steel Co.,Ltd.,Tangshan Hebei 063299,China)
机构地区:[1]首钢京唐钢铁联合有限责任公司,河北唐山063299
出 处:《山西冶金》2024年第7期242-244,254,共4页Shanxi Metallurgy
摘 要:针对某酸连轧机组换辊时间过长的问题,通过对该产线换辊装置和换辊控制时序进行解读分析,并结合现场实际情况,得出影响轧机换辊时间的原因主要包括换辊控制时序步骤繁琐、轧机设备动作缓慢、信号检测精度差等,通过修改换辊顺控、调整设备动作速度、优化控制程序、优化检测方式等措施,使换辊时间降低了33%,提高了产线作业率。Aiming at the problem of too long roll change time of an acid tandem mill,this paper analyzed the roll change device and roll change control time sequence of the production line,combined with the actual situation of the site to analyze the main reasons affecting the roll change time of the mill,including cumbersome roll change control time sequence steps,slow operation of the mill equipment,poor signal detection accuracy,etc.By modifying the roll change control,adjusting the equipment speed,optimizing the control program and optimizing the detection method,the roll change time is reduced by 33%and the operation rate of the production line is increased.
分 类 号:TG333[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7