英红西互通L匝道桥支架现浇梁施工关键技术  

Analysis of Key Technologies for the Construction of Cast-in-Situ Beams of Yinghong West Interchange L ramp Bridge Support

在线阅读下载全文

作  者:黄涛 Huang Tao

机构地区:[1]中铁十四局集团第二工程有限公司,山东泰安271000

出  处:《江苏建材》2024年第4期107-109,共3页Jiangsu Building Materials

摘  要:英红西互通L匝道桥专为跨越汕昆高速主线桥而设,其现浇梁模板设计和支撑系统设计是英红西互通L匝道桥施工的关键。基于此,文章提出了英红西互通L匝道桥支架现浇梁模板设计和支撑系统设计思路,分析了主要施工工艺,并测试了施工项目斜杆扣件连接的强度,验证了扣件的抗滑承载力能够满足工程设计要求,旨在为同类型工程建设提供参考。The Yinghong West Interchange L ramp bridge is designed to cross the main line bridge of Shankun Expressway,and its cast-in-place beam formwork design and support system design are the key to the construction of Yinghong West Interchange L ramp bridge.Based on this,this paper proposes the design ideas of cast-in-situ beam formwork and support system of Yinghong West Interchange L ramp bridge support,analyzes the main construction technology,and tests the strength of the diagonal rod fastener connection of the construction project,and verifies that the anti-slip bearing capacity of the fastener can meet the engineering design requirements,aiming to provide a reference for the construction of the same type of project.

关 键 词:现浇梁施工 模板设计 支撑系统设计 施工工艺 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象