检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:柳舒甫 LIU Shu-fu(Yellow River Property&Casualty Insurance Co.,Ltd.,Lanzhou 730050,China)
出 处:《价值工程》2024年第26期129-132,共4页Value Engineering
摘 要:预应力混凝土斜拉桥主梁应力监控时,若考虑剪力滞效应,进行主梁应力的监测,则理论应力与实测应力更加吻合。在某斜拉桥的施工控制中,将基于能量变分法导出的每节点两剪力滞自由度的有限梁段法理论应用到主梁的应力监控中,取得了较好的效果。因此得出在大跨度预应力混凝土桥梁的施工监控中开展剪力滞效应研究,不但突破了剪力滞理论仅应用于桥梁设计的局限性,而且进一步完善了桥梁施工监控的内容。When monitoring the stress of the main beam of a pre-stressed concrete cable-stayed bridge,if the shear hysteresis effect is considered and the stress of the main beam is monitored,the theoretical stress is more consistent with the measured stress.In the construction control of a cable-stayed bridge,the finite beam segment method theory based on the energy variational method with two shear lag degrees of freedom at each node was applied to the stress monitoring of the main beam,and achieved good results.Therefore,conducting research on shear hysteresis effect in the construction monitoring of large-span pre-stressed concrete bridges not only breaks through the limitations of shear hysteresis theory only applied to bridge design,but also further improves the content of bridge construction monitoring.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.146.206.0