检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王鹏[1] 梁正召[1] 张正虎 韩鞠 詹必雄 刘铁新 WANG Peng;LIANG Zhengzhao;ZHANG Zhenghu;HAN Ju;ZHAN Bixiong;LIU Tiexin(School of Civil Engineering,Dalian University of Technology,Dalian 116024;China Construction First Group Construction&Development Co.Ltd.,Beijing 100102;Department of Civil Engineering,Dalian Maritime University,Dalian 116026)
机构地区:[1]大连理工大学土木工程学院,辽宁大连116024 [2]中建一局集团建设发展有限公司,北京100102 [3]大连海事大学交通运输工程学院,辽宁大连116026
出 处:《土工基础》2024年第4期655-659,共5页Soil Engineering and Foundation
摘 要:基坑工程的施工风险预警是保证基坑安全施工的重要工作,但现有的基坑失稳预警思路只是将某个或某些监测点的破坏视为基坑失稳破坏。以保证基坑安全为前提,从基坑监测点安全和整个基坑体系安全两个层面对基坑进行安全预警。基坑监测点安全的预警,利用所建立的基坑监测项目安全预警分级实现;对基坑体系安全稳定的预警,则是通过建立监测数据和整个基坑体系稳定性之间的层次分析框架,并依赖监测项目安全预警分级表实现了对整个基坑安全稳定的定性和定量评价。该预警方法有效地将监测与预警相结合,并将二者的模糊关系转变为清晰量化的数学关系,为有效解决基坑安全预警问题提供了新思路。The construction risk early warning of the deep excavation is an important task to ensure the safe construction of the excavation.However,the existing deep excavation’s early warning idea is based on the failure of one or more monitoring points as the instability of the deep excavation.Using the principles of ensuring the safety of the deep excavation,the safety early warning of the excavation is carried out from the safety of the excavation monitoring points and the safety of the entire excavation system.The early warning for the safety of the deep excavation monitoring points is realized by using the established safety early warning classification.The early warning of the safety and stability of the excavation system is to achieve a qualitative and quantitative evaluation of the safety and stability of the entire system by establishing an Analytic Hierarchy Framework(AHP)between monitoring data and the stability of the entire system throughout the monitoring project safety early warning grading table.The early warning method effectively combines the monitoring and the early warning and transforms the fuzzy relationship between the two into a clear and quantitative mathematical relationship,which provides a new idea to effectively solve the deep excavation safety early warning problem.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7