检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈旭 卢萍 CHEN Xu;LU Ping(Geological Exploration and Design Institute Co.Ltd.,Guizhou Non-Ferrous and Nuclear Geological Investigation Bureau,Guiyang 550005;Guizhou Shunda Water Transportation Planning,Investigation and Design Co.Ltd.,Guiyang 550001)
机构地区:[1]贵州省有色金属和核工业地质勘查局地质勘测设计院,贵阳550005 [2]贵州顺达水运规划勘察设计研究院有限公司,贵阳550001
出 处:《土工基础》2024年第4期664-668,共5页Soil Engineering and Foundation
摘 要:为研究建筑边坡在支护后坡体的地表位移变形及其稳定性,以贵州某建筑边坡为例,结合该边坡的地质勘察资料,在2018年5月~2019年2月监测期内对边坡进行实时监测,通过监测数据分析了建筑边坡的地表位移变化规律及其稳定性。结果表明:①该边坡的地表位移随监测时间的推移呈先先平稳变化后急剧变化,最后趋于平稳变化。在2018年5月~2018年9月监测期内位移增长最明显,最大累积变形达到为971.8 mm;②边坡出现了局部位移变化,存在贯通张拉裂缝,且边坡变形进行强化阶段,稳定性较差;③通过监测结果看,边坡存在滑坡灾害隐患,建议重新对边坡采取综合评价,制定综合治理措施,同时加强对危险点的观察。To study the post construction stability and the deformation of a reinforced building slope,this paper presents a history of the surface deformation monitoring of a building slope in Guizhou.By using the site investigation data,the surface movement of the building slope was monitored,and the stability of the slope was analyzed from May of 1028 to February 2019.The results indicate that,①within the monitoring period,the slope movement has a trend of stabilized,rapid and then stabilized movement.The most rapid movement was observed in the period between May and September 2018 with a largest movement of 971.8 mm.②Localized movement and tension crack throughout the entire slope at the top.The global stability of the slope is relatively questionable.③the slope monitoring data indicate that a slope stability hazard is existed in this building slope and the in-depth stability evaluation of this building slope is suggested so that a comprehensive mitigation plan can be implemented.Continued movement monitoring of the slope is also suggested.
分 类 号:P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49