检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄小武[1] 贾永胜[1,2] 孙金山 姚颖康 赵先锋 周军 曲兵兵 王铭锋 HUANG Xiao-wu;JIA Yong-sheng;SUN Jin-shan;YAO Ying-kang;ZHAO Xian-feng;ZHOU Jun;QU Bing-bing;WANG Ming-feng(Wuhan Explosion&Blasting Co.,Ltd.,Wuhan 430056,China;State Key Laboratory of Precision Blasting,Jianghan University,Wuhan 430056,China;Wuxi Holyview Electronics Co.,Ltd.,Wuxi 214000,Jiangsu,China;He nan Qianjin Chemical Co.,Ltd.,Luoyang 471000,Henan,China)
机构地区:[1]武汉爆破有限公司,武汉430056 [2]江汉大学省部共建精细爆破国家重点实验室,武汉430056 [3]无锡盛景微电子股份有限公司,江苏无锡214000 [4]前进民爆股份有限公司,河南洛阳471000
出 处:《工程爆破》2024年第4期86-91,141,共7页Engineering Blasting
基 金:中国工程院战略研究与咨询基金资助项目(2023-XZ-35);湖北省重点研发计划基金资助项目(2020BCA084)。
摘 要:近年来,工业电子雷管的产量总体保持高速增长,主要应用于露天土岩和隧道掘进爆破领域,在拆除爆破领域的使用量不足5%。为分析工业电子雷管在拆除爆破应用过程中存在的问题,结合拆除爆破工程案例,发现逐发扫描录入雷管的效率较低,需提高工业电子雷管起爆系统单台起爆器的起爆能以及扫描录入雷管和连接卡扣的效率。结合大规模工业电子雷管起爆网路试验,发现工业电子雷管起爆网路的传爆可靠性较高,雷管的报错率为0.03%~0.07%,拒爆率为0.02%;通过扫描盒条码录入雷管,可显著提高连网的操作工效。在拆除爆破工程中,需要根据结构的倒塌运动过程合理设置构件的起爆时间,根据工程规模定制合适的盒包装雷管数量,从而提高工业电子雷管起爆网路的适用性。In recent years,the production of industrial electronic detonators has maintained a rapid growth in general,mainly used in the field of open-pit blasting and tunnel blasting,and the use of industrial electronic detonators in the field of demolition blasting is less than 5%.In order to analyze the problems existing in the application of industrial electronic detonators in demolition blasting,this paper combines the case of demolition blasting engineering,and finds that the efficiency of scanning and recording detonators is low.The industrial electronic detonator initiation system needs to improve the initiation energy of a single initiator,and improve the efficiency of scanning and recording detonators and connecting buckles.Combined with the large-scale industrial electronic detonator firing circuit test,it is found that the detonation reliability of industrial electronic detonator firing circuit is high,the error rate of the detonator is 0.03%~0.07%,and the rejection rate is 0.02%.By scanning the box bar code into the detonator,the operation efficiency of the network can be significantly improved.In the demolition blasting project,it is necessary to reasonably design the initiation time of the components according to the collapse movement process of the structure,and design the appropriate number of box-packed detonators according to the engineering scale,so as to improve the applicability of the electronic detonator firing circuit.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30